How We Work

    From discovery to dock, every step is intentional.

    We don’t sell off the shelf packaging. Every order is engineered to your spec, quoted transparently, and tracked through production by a single point of contact. Here’s how it works.

    Custom cosmetic packaging components including jars, pump bottles, and tubes
    MOQ
    5,000 per SKU
    Quote
    48-hour turnaround
    FOB
    Los Angeles · USA & Canada
    CIF
    Direct shipping worldwide
    Quality & compliance
    Manufactured in an ISO 9001:2015 certified facility.
    01

    Discovery

    We start by understanding your brand, product, and market. What are you packaging? Where does it sell? What’s the shelf life and formula type? This context shapes every decision that follows.

    02

    Needs Assessment

    We dig into the specifics: volume, material preferences, decoration method, sustainability targets, and budget. If you have a brief, we review it. If not, we help you build one.

    03

    Reference Artwork & Design

    Share your brand guidelines, reference samples, or mock-ups. Our design team reviews artwork feasibility, advises on print tolerances, and confirms decoration compatibility with your chosen format.

    04

    Art Approval & Proof Sign-Off

    Nothing moves to tooling without your written approval. You review digital proofs, color draws, and layout renders. Once signed off, the spec is locked. Changes after this point can incur fees and delay the schedule.

    05

    Custom Quote

    We engineer a costed proposal around your exact spec: resin, tooling, decoration, assembly, and freight. Every line item is transparent. Typical turnaround is 48 hours.

    06

    Quote Accepted & Deposit

    Once you approve the quote, a deposit secures your slot on the production schedule. We confirm the payment schedule, PO terms, and milestone dates in writing.

    07

    Materials Sourced & Confirmed

    We lock in raw material orders for resins, caps, liners, labels, and substrates with verified suppliers. Lead times and color lots are confirmed before tooling begins.

    08

    Slotted & Scheduled

    Your job is locked into the production calendar. We prepare tooling, assign a project manager, and track every milestone until shipping.

    09

    Optional Pre Production Samples

    Available on request for any order size, not standard. Let us know if you need them during discovery. Keep in mind they typically extend lead time by 3 to 4 weeks, pause regular production flow, and incur additional international shipping costs.

    10

    Sample Approval by Client

    If pre production samples were requested, you evaluate color, print, fit, and finish. Approve in writing or request adjustments. This is your final checkpoint before full scale production.

    11

    Production

    The full run begins: extrusion or molding, decoration, assembly, and inline quality checks. Your project manager provides weekly progress updates and photos from the factory floor.

    12

    QC Inspection

    Finished goods pass a structured QC protocol covering dimensional checks, color verification, print adhesion, seal integrity, and packing standards. We do not ship until the batch passes.

    13

    Ships FOB Los Angeles

    Once QC is cleared, goods are packed, palletized, and handed off for ocean freight. Terms are FOB Los Angeles. Typical transit from factory dock to LA is factored into the 10 to 12 week timeline.

    Typical Timeline

    10 to 12 weeks from brief to first production run.

    Week 1 to 2

    Discovery & Needs Assessment

    Brief review, material selection, artwork evaluation

    Week 2 to 3

    Quote & Approval

    Custom proposal, terms confirmation, deposit received

    Week 3 to 4

    Design Finalization

    Artwork approval, print proofing, optional sample request

    Week 4 to 8

    Tooling & Sampling

    Mold preparation, color matching, optional samples if requested

    Week 8 to 10

    Production Run

    Extrusion or molding, decoration, assembly, inline QC

    Week 10 to 12

    Final QC & Shipping

    Final inspection, packing, FOB Los Angeles

    Timelines vary by project complexity, custom tooling requirements, and material availability. Rush schedules available on request.

    Ready to start your project?

    Tell us what you’re making. We’ll review your brief and return a costed proposal within 48 hours.

    Request a Quote →